How to Use a Thermal Shock Chamber: Install, Load, Program and Maintain
Last updated November 2026 · LORDERAN how-to guide
Short answer: a two-zone thermal shock chamber keeps a hot zone and a cold zone at their set points and moves the specimen basket between them. Install it upright, level and with room to breathe, load the basket without blocking the vents, then program each segment with its pre-conditioning value, test temperature and dwell time. Keep the door shut while it runs, stop tests from the controller rather than the power switch, and clean the condenser every three months. Figures come from the LORDERAN two-zone thermal shock chamber user manual.
1. How it works
The hot chamber sits above the cold chamber. A motor with a brake drives the basket between them, and position sensors confirm it has reached the top or bottom. The manual lists three modes: high-temperature testing, low-temperature testing and thermal shock cycling.
Two zones, one basket
The basket carries the specimens up and down.
One test cycle
High dwell, transfer, low dwell, repeat.
2. Install it
Installation and electrical connection are for qualified people. The manual says not to run the chamber until it is fully installed and set up.
-
1Move it uprightKeep it upright in transport and storage so compressor oil stays in place. Use a forklift or lifting straps, never steel cables.
-
2A level, solid floorOut of sunlight, ventilated, low dust and free of flammable or corrosive gases. Ambient 5 to 35 °C, 45 to 85 %RH. Lower the four feet and level with a spirit level: poor levelling can damage the compressor.
-
3Leave spaceRoom for the door to open fully and for maintenance at the sides. On air-cooled units, keep more than 0.8 m (31 in) between the condenser exhaust and the wall.
-
4Power to the nameplateA dedicated breaker rated above the maximum current, a grounded terminal and supply fluctuation under 5 %. Connect with the power off.
-
5Water and drainWater-cooled units need 5 to 32 °C water with steady flow, a shut-off valve and a 10 bar relief valve; never start with the valves closed. Run the condensate drain downward to a floor drain.
3. Load the basket
The basket moves every cycle, so loose parts and blocked air ducts are the two things to avoid. Airflow sets the temperature uniformity.
-
1Inside the basketNothing may stick out past the basket. Leave a gap to its edges and fix specimens so they cannot fall or shift when it moves.
-
2Vents clearNever block the air intake or return vents; blocked airflow increases test error.
-
3Cables through the portRoute test leads through the test port and seal any gap around the cables.
-
✕Never insideExplosive, flammable or oxidizing substances: the chamber is not explosion-proof. Corrosive materials such as chlorides and acids shorten the life of the compressor and door gasket. Loose conductive parts can fall into the air-conditioning section.
4. Program and run a test
Keep every value inside the range on your chamber's nameplate. Test values cannot be changed while a test runs.
Write the program
-
1SegmentsFor each segment set MODE (HIGH or LOW), BSV (pre-heat or pre-cool value), TEST (test-area temperature) and TIME (dwell).
-
2Time formatWith no unit shown, time is hours.minutes: 1.30 is 1 h 30 min and 0.01 is 1 min.
-
3CyclesSet the loop count, which zone goes first, and LINK to chain another program.
Set the functions
-
1WaitingSet the wait bands so the dwell only counts once the zone is in range.
-
2DefrostBy time or after a number of cold exposures, for example every 5.
-
3Restart modeSTOP needs a manual restart after a power cut. COLD restarts from segment 1. HOT resumes the interrupted segment.
Run and finish
-
1RunTap RUN. PAUSE holds the test; STOP ends it. Keep the door shut.
-
2Stop from the controllerNever cut the power to end a test, and never during high-temperature operation. In COLD or HOT mode the chamber restarts when power returns.
-
3UnloadLet it return to ambient, open with heat- or cold-resistant gloves, then export the data to USB.
Surfaces above 38 °C or below 0 °C can burn or cause frostbite. Above 55 °C the interior, basket and specimens are very hot. Opening the door with a large temperature difference can damage the equipment, and frequent opening lets moisture in, which can freeze the evaporator.
Alarms and troubleshooting
After fixing the cause, press Reset on the control panel. If the alarm returns, send LORDERAN the model, serial number and alarm. Electrical work is for a qualified electrician with the power off.
Maintenance
Have the refrigeration, electrical system and compressor checked by a professional once a year. Before a long idle period, dry the chamber: 60 minutes with the door closed, then 15 minutes with it slightly open.
Manuals and guides
The full manual covers every controller screen, alarm and wiring detail.
Questions
How fast does the basket move between zones?
The manual lists a 5 second transition and a 5 minute recovery time for the CJ-500. Check your model's specification for its own figures.
Can I test flammable or explosive items?
No. The manual rules out explosive, flammable and oxidizing substances because the chamber is not explosion-proof.
What happens after a power cut?
That depends on the restart mode: STOP waits for you, COLD restarts from the first segment and HOT resumes the segment that was running.
Why does the cold zone ice up?
Moisture enters when the door is opened, especially with a large temperature difference. Keep openings short and set a defrost by time or by number of cold exposures.
How do I get the test data?
Insert a USB drive, select the file and export as XLS or BIN. At the standard 60 s interval the chamber stores about a year of records, then overwrites the oldest.















